Winter Street Corridor Improvement Project
Location: Winter Street, Waltham, MA
This project consisted of the replacement of water mains along this corridor as a result of redevelopment of properties in the area. Marois Brothers, Inc. performed some roadway re-alignment and traffic signal installation but mainly the project was required due to poor water service in that area of Waltham.
We installed approximately 2,000 LF of new 16” ductile iron water pipe with associated gates and service connections within the existing Winter Street roadway while having to avoid all other utility conflicts and performing most of our work at night to limit traffic flow impacts. We were responsible for maintaining safe and appropriate traffic flow during the course of the project as well. Vanesse and Associates was the design firm for the project along with support and approval of MASS DOT representatives. Total project cost was $2.2 million dollars.