Ware Solar Project
Location: Ware, MA
Under contract with Ecos Energy, Minneapolis MN
Complete site preparation for the development of a 66-acre parcel of land in Ware, MA. Scope includes land clearing, grading and drainage installation along with main duct-bank systems and directional boring as required to prepare the site for solar panel installation.